The only way you can get enough Rodd.

Thursday, September 06, 2007

working, followed by working

Work has been crazy these last 4 weeks. It seems that if I finish one thing, I have 3 more calls about other things that need to be done.
After work these last couple weeks I have had plenty to do at home also. We had some family in town over Labor Day weekend, so we had to get everything looking good again. It had been a while. :) Then this week I got to spend way too much time trying to fix a running toilet. I replaced the part that I thought was the problem, but it still ran, so I basically replaced everything, which typically is still a quick job, but the bolts that hold the tank on to the bowl were so corroded that I ended up having to cut the nuts off the bolts to get them out. This was bad in all ways except that it gave me another excuse to get a Dremel. I had one years ago, but it's motor died, then I got a battery powered one, (even when new the battery lasted about 4 minutes) but that now lasts about 2 revolutions. Cutting the bolts sucked, but it got the job done, and we once again have a functional toilet on each floor.

1 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home